Estimate flows where there is no gauge
A bridge, culvert or permit needs design flows at an ungauged point. The aim is to delineate the basin above the point and compute its flow statistics. The result: peak and low flow estimates for the point.
- Occupation
- Hydrologists
- Occupation code
- 19-2043.00