Take off quantities from a set of plans
A subcontractor or supplier has a drawing set to bid on. The aim is to get counts, lengths and materials measured from the drawings. The result: a priced bid out in hours, not days.
A subcontractor or supplier has a drawing set to bid on. The aim is to get counts, lengths and materials measured from the drawings. The result: a priced bid out in hours, not days.
Send one link and we add it to the graph: what it works on, what it costs and what it connects to.
Free, or $100 one time for review in 1 to 2 days.