{
  "id": "alasco/alasco-change-order-document-api",
  "sourceId": "alasco:alasco-change-order-document-api",
  "providerSlug": "alasco",
  "productSlug": "alasco-change-order-document-api",
  "name": "Alasco Change Order Document API",
  "provider": {
    "id": "alasco",
    "name": "Alasco",
    "platform": false,
    "external": true
  },
  "kind": null,
  "category": "utilities-energy",
  "categories": [
    "utilities-energy"
  ],
  "categoryInferred": true,
  "capability": null,
  "capabilityHints": [
    "alascoChangeOrderDocumentAPI"
  ],
  "summary": "A **Change Order Document** is a file attached to a **Change Order** (for example the amendment offer or supporting evidence). You can upload and download them; a document left unlinked is removed aut",
  "url": "https://developer.alasco.de/fincon.html",
  "qa_score": null,
  "agent_default": false,
  "pricing": null,
  "sandbox": null,
  "sla": null,
  "coordinates": {
    "industry": "utilities-energy",
    "function": null,
    "occupations": [],
    "records": []
  },
  "assigned": [],
  "demo": false,
  "external": true,
  "federated": false,
  "apis_ax": null,
  "source": "apis.io",
  "sources": [
    "apis.io"
  ],
  "tier": 1,
  "probe": {
    "probedAt": "2026-08-24",
    "probeVersion": "0.1",
    "reachable": true,
    "rootStatus": 200,
    "latencyMs": 1753,
    "docsLive": null,
    "specFound": false,
    "specUrl": null,
    "machineFace": false,
    "authDocumented": false,
    "cors": false,
    "timeouts": 0,
    "errors": [],
    "probeScore": 1
  },
  "externalScores": {
    "apisIo": {
      "composite": 52.1,
      "band": "developing",
      "agentReadiness": 38.1,
      "scoredAt": "2026-08-21",
      "source": "apis.io published scores; not a platform/api.qa score"
    }
  },
  "naics": {
    "code": "541620",
    "level": "national-industry",
    "basis": "sourceCategory:climate-sustainability",
    "inferred": true
  },
  "economicClass": "EFFECT",
  "economicClassInferred": true,
  "economicClassBasis": "effect verb in source operations",
  "interfaces": [],
  "urls": {
    "html": "https://apis.directory/apis/alasco/alasco-change-order-document-api/",
    "json": "https://apis.directory/apis/alasco/alasco-change-order-document-api.json"
  }
}