{
  "id": "createProductionProjectWorkBreakdown",
  "slug": "create-production-project-work-breakdown",
  "name": "Create production project work breakdown",
  "description": "Derived capability (status: derived, not curated) — mechanically derived from apqc (1 G1 anchor).",
  "category": null,
  "categories": [],
  "root": null,
  "ply": null,
  "status": "derived",
  "source": "apqc",
  "g1Anchors": [
    "APQC PCF 4.3.3.7 (aerospace-and-defense) pcfId 11981"
  ],
  "anchorCount": 1,
  "act": {
    "verb": "create",
    "patient": "Production Project Work Breakdown",
    "patientSlug": "production-project-work-breakdown",
    "curated": false,
    "inferred": true
  },
  "urls": {
    "html": "https://apis.directory/capability/create-production-project-work-breakdown/",
    "json": "https://apis.directory/capability/create-production-project-work-breakdown.json"
  },
  "offerings": []
}