{
  "id": "determineRequiredSupportResourceLevels",
  "slug": "determine-required-support-resource-levels",
  "name": "Determine required support resource levels",
  "description": "Derived capability (status: derived, not curated) — mechanically derived from apqc (19 G1 anchors).",
  "category": "accounting-tax",
  "categories": [
    "accounting-tax"
  ],
  "root": "industry",
  "ply": null,
  "status": "derived",
  "source": "apqc",
  "g1Anchors": [
    "APQC PCF 8.7.5.2 (cross-industry) pcfId 20897",
    "APQC PCF 8.7.5.2 (aerospace-and-defense) pcfId 20897",
    "APQC PCF 8.7.5.2 (airline) pcfId 20897",
    "APQC PCF 8.7.5.2 (automotive) pcfId 20897",
    "APQC PCF 8.7.5.2 (banking) pcfId 20897",
    "APQC PCF 8.7.5.2 (broadcasting) pcfId 20897",
    "APQC PCF 7.7.5.2 (education) pcfId 20897",
    "APQC PCF 8.7.5.2 (city-government) pcfId 20897"
  ],
  "anchorCount": 19,
  "urls": {
    "html": "https://apis.directory/capability/determine-required-support-resource-levels/",
    "json": "https://apis.directory/capability/determine-required-support-resource-levels.json"
  },
  "offerings": []
}