{
  "id": "manageEngineeringChangeOrders",
  "slug": "manage-engineering-change-orders",
  "name": "Manage engineering change orders",
  "description": "Derived capability (status: derived, not curated) — mechanically derived from apqc (3 G1 anchors).",
  "category": null,
  "categories": [],
  "root": null,
  "ply": null,
  "status": "derived",
  "source": "apqc",
  "g1Anchors": [
    "APQC PCF 2.5.3 (aerospace-and-defense) pcfId 11419",
    "APQC PCF 2.3.6.1 (consumer-electronics) pcfId 11419",
    "APQC PCF 2.3.4.3 (consumer-products) pcfId 11419"
  ],
  "anchorCount": 3,
  "urls": {
    "html": "https://apis.directory/capability/manage-engineering-change-orders/",
    "json": "https://apis.directory/capability/manage-engineering-change-orders.json"
  },
  "offerings": []
}